Extreme heat and health alerts
Both the Met Office and UK Health Security Agency (UKHSA) have extended the red alerts for Surrey and the south east until 11pm on Friday 26 June.
How to book a site inspection for the different stages of your building project.
We regularly inspect your building work to make sure that the person carrying out the work complies with building regulations before any work is covered up.
To book a site inspection, please contact the building control surveyor for your area.
We need to inspect your work at least 2 working days before you cover up any elements or fittings and within 5 working days of all work finishing.
You, or your builder, must tell us about:
We may also make additional inspections where we feel these are necessary.
We recommend that you take an interest in the work you are having carried out. Arrange to meet the builder and building control surveyor together on site so that any building regulations problems can be resolved before the builder leaves the site.
We will usually issue you with a specific inspection timeframe, telling you when to book your inspections. These are our general inspection stages.
| Stage | Contact type | Period of notice required |
|---|---|---|
| Commencement of work | Email or phone | 1 day before the works start |
| Excavations for foundations | Email or phone | 1 day before the inspection |
| Foundation concrete | Email or phone | 1 day before the inspection |
| Oversite preparation before concreting | Email or phone | 1 day before the inspection |
| Reinforcement before concreting | Email or phone | 1 day before the inspection |
| Damp proof course laid | Email or phone | 1 day before the inspection |
| Exposed drains ready for inspection (and on test) | Email or phone | 1 day before the inspection |
| First floor joists | Email or phone | 1 day before the inspection |
| Steel beams or columns (before encasing) | Email or phone | 1 day before the inspection |
| Roof timbers (before covering) | Email or phone | 1 day before the inspection |
| Completion of works | Email or phone | Within 7 days |